Traffic closure announced on the 25th of April Bridge
The 25th of April Bridge, which connects Lisbon to the South Bank of the Tagus River, will be closed to traffic on 31 May between 8:30 am and 10:30 am, in the South/North direction, due to the Pedala Portugal ride, Lusoponte announced.
المصدر: The Portugal News
0
Views

